Please select the category from below.
Schools
|
|
|
The Problem:
You
are the Director of Public Works
and your Maintenance Director for
the school district has been telling
you that the District’s main
middle school facility has a failing
piping system. The school is a 2
level full facility building servicing
around 400 students and was constructed
in 1968 with an addition in 1988.
|
|
|
|
|
The Problem:
The
Zela Davis School is a multi building
facility built in the 1940s. The
domestic water system was primarily
galvanized with some copper updates.
The piping system was failing with
pinhole leaks, rusty water, and reduced
flow. Excessive costs associated
with a repipe including; temporarily
closing the school ...
|
|
|
|
|
|
See how the ACE DuraFlo process works.
|
|
|